In this episode of the Building PA Podcast, Jon O’Brien and Christopher Martin speak with Ryan Parrish of Pennsylvania 811 about subsurface safety, design obligations, project coordination, and the information excavators need before work begins.

The conversation covers the responsibilities of designers and project owners, the importance of verifying underground utility information, Pennsylvania 811 training opportunities, and how Coordinate PA can help stakeholders communicate during complex projects.

Episode Transcript

This transcript has been lightly edited for clarity. The conversation’s meaning and substance have not been changed.


0:05 | Jon O’Brien

Hello and welcome to the Building PA Podcast. I am co-host Jon O’Brien from the Keystone Contractors Association, coming to you from good old Central PA, right outside of Harrisburg in the great little town of Dillsburg.

Always great to be on the podcast. Great to have our listeners with us, and even more fantastic to be joined by co-host Chris Martin.

Chris, what’s going on today?

0:34 | Christopher Martin

Hey, Jon, thank you for that again. You always make me feel so happy and welcome when you introduce me.

Unfortunately, I’m not in Dillsburg. I am in the lovely village of Sewickley. We don’t have anything to claim to fame, like the pickle or anything like that around the holidays. But Light Up Night is coming soon.

Hello, everyone. I am Chris Martin with Atlas Marketing. We tell stories for companies that build things, and you can check us out at atlasstories.com.

1:06 | Christopher Martin

Today we’re talking about excavation and safety, right, Jon?

1:12 | Jon O’Brien

Absolutely. We love safety on the podcast, whether it’s elevated-work safety, confined-space safety, vehicle safety, or any other kind of safety.

Today, we’re talking about subsurface safety. Who better than Ryan Parrish from Pennsylvania One Call to join us and talk about excavation safety?

Welcome, Ryan.

1:40 | Ryan Parrish

Thank you, guys. I appreciate it.

1:46 | Jon O’Brien

Let’s jump right in. Before we talk about the topic at hand, who is Ryan? Who is this superstar that our audience is about to hear from?

1:57 | Ryan Parrish

I’m one of 12 liaisons with Pennsylvania 811. I’m the middleman between the underground utility, the designer or engineer, and the One Call Center.

I field many of the complaints and issues and provide training and education for the eastern side of Pennsylvania.

There are 12 of us, and I cover four counties: Berks, Lehigh, Northampton, and Schuylkill. Those are the primary counties where I provide education and awareness.

2:26 | Christopher Martin

I would imagine that much of the education and awareness involves calling before you dig and other things everyone in the industry knows about.

What are some of the other things you do around education and awareness?

2:42 | Ryan Parrish

One of our main educational programs is PA One Call Safety Days. We’ll have approximately 400 or 500 municipal representatives, engineers, and excavators attend from counties across the state.

We have five events across the state. Our first is May 15 in Cranberry. It’s a large expo with engineers discussing their obligations, excavators discussing their obligations, and One Call conducting sessions.

It’s a large training day and one of our primary ways to provide outreach.

3:17 | Jon O’Brien

And Chris, it is fun.

Along with Cranberry, they go to York and, I believe, the State College area.

3:26 | Ryan Parrish

We’re doing five this year: Cranberry, Oaks, York, Allentown, and State College for 2025.

3:35 | Christopher Martin

Ryan, if you wouldn’t mind sharing those dates with us, we’ll put them on the podcast website and help promote them.

3:42 | Ryan Parrish

That would be awesome.

3:56 | Jon O’Brien

We’ve been promoting the events for the past several years so our members know about them.

What is the big trend in excavation safety these days? What is the hot topic?

4:13 | Ryan Parrish

The hot topic right now is probably design.

I joke with people and say that the design is the excavator’s set of instructions. If you go to IKEA and get a piece of furniture without instructions, it will take you forever to install whatever you’re trying to build.

We make sure designers complete the proper design before giving it to the excavators. Excavators need to know what they will be working around and what they cannot excavate around so everyone stays safe.

Design and project-owner obligations are what we’re really focusing on at One Call right now.

4:50 | Christopher Martin

From the owner’s perspective, what are some things they need to know about underground issues, infrastructure issues, and related concerns?

5:07 | Ryan Parrish

Project owners need to understand that if something is wrong with a design plan and they give it to an excavator, we’re telling the excavator to stop digging.

Don’t dig around a design plan that doesn’t make sense.

Sometimes project owners hire designers who are trying to design around paper records from the 1970s. The designer may need to return to the project owner and say, “I need to get a vacuum truck out here to expose these utilities before I finish the design.”

The designer does not want to give a bad design plan to an excavator who could then strike a utility line. Otherwise, everyone may end up going back and forth with lawyers trying to determine who was responsible.

Project owners need to recognize that if designers cannot determine where the utilities are, they cannot safely design around them. The designer may need additional funding to determine where those utilities are before giving the project to the excavator.

6:09 | Christopher Martin

From an owner’s perspective, what do they need to know from a regulatory or legislative standpoint?

6:31 | Ryan Parrish

If someone owns an underground utility that serves anyone other than the owner, that person may be required to become a Pennsylvania One Call member.

For example, if someone has a propane tank in the backyard and it only serves that person’s pool, that person may not be required to become a member.

If the tank also serves a neighbor, another property, or a business down the road, it serves someone else. The owner may then be required to become a Pennsylvania One Call member.

The owner must determine where those underground utilities are so the information can be entered into the One Call system.

If excavation will occur near those utilities, the owner receives notice and can have the utilities located to protect the assets from damage.

7:24 | Jon O’Brien

Chris mentioned legislation. Are you involved in legislation as part of your role?

7:32 | Ryan Parrish

I am not.

There was recently a law change, so the liaisons are reviewing it before telling everyone exactly what changed.

We expect to provide information and training to our members once we have completed that review.

8:38 | Jon O’Brien

Are there other safety, education, or project-owner trends keeping you awake at night?

8:55 | Ryan Parrish

For excavators, it’s getting out to the jobsite and not rushing through the project.

Go to the jobsite before work begins. Take notice of anything that appears to be wrong.

If something is wrong, re-notify 811 so the utilities can be remarked if needed or so stakeholders can discuss what is happening at the jobsite.

Too often, people arrive at a jobsite and know something is wrong. They may have a strict timeline and be afraid to return to the project owner to request more time or funding.

They rush through the work and damage utilities.

My water line was recently struck because a crew was cross-boring without following the proper Pennsylvania One Call process. The damage could have been avoided if the correct process had been followed.

9:50 | Jon O’Brien

That speed to market hurts the industry. Whether we’re discussing excavation or general safety, the rush to complete the work is a major challenge.

9:58 | Ryan Parrish

Pennsylvania is receiving federal funding for fiber and underground communication lines, which is creating additional demand and schedule pressure.

Pennsylvania One Call has an application called Coordinate PA. It allows stakeholders to enter projects and coordinate or collaborate.

Instead of one organization opening and repaving a road, followed by another organization digging up the same road a month later, stakeholders can coordinate their work.

If everyone enters projects into Coordinate PA, they can identify opportunities to complete multiple scopes while the road is already open. They may also be able to share restoration costs.

The application helps make communication more successful.

11:07 | Christopher Martin

Could you talk more about Coordinate PA? I’m involved in the industry, but I had never heard about it.

11:21 | Ryan Parrish

We experienced many situations in which one group completed a project and paved the road, only for someone else to open the road again a month later.

Our Pittsburgh office held Pittsburgh Connect meetings where stakeholders discussed current and upcoming projects.

Stakeholders wanted a way for designers, excavators, and facility owners to communicate in one place. Similar applications existed, but they cost money.

Our president, Bill Kiger, proposed creating a cost-free application called Coordinate PA.

Project owners can create the project footprint and send it to the designer. The designer can complete the design information within Coordinate PA. The project can then move to the excavator, who can enter excavation tickets within the same project.

Coordinate PA can also prompt users to create a complex-project meeting with facility owners and establish a locate schedule.

Stakeholders can discuss how many feet need to be located and whether the work can be completed within the required time frame.

It provides a central place to manage the larger project.

13:12 | Christopher Martin

That sounds logical. If someone already has the road open and it can stay open for another week, why not add more work and complete it more efficiently?

I had not heard about Coordinate PA before. I think it’s a useful tool.

13:28 | Ryan Parrish

We offer webinars and training about Coordinate PA, and we want people to use it.

It’s where Pennsylvania One Call is heading. I encourage people to learn the system now.

It’s better than trying to meet with every designer and stakeholder individually.

13:45 | Christopher Martin

Is Coordinate PA required for larger projects, such as projects covering more than 1,000 feet?

13:59 | Ryan Parrish

Any job over 1,000 feet is required to be treated as a complex project.

All complex projects must be entered into Coordinate PA.

Coordinate PA allows users to complete design notifications, sends information to facility owners, and lets excavators see the responses in one place.

14:46 | Jon O’Brien

Coordinate PA also includes a collaboration meeting that gets the project stakeholders involved and on the same page, correct?

15:01 | Ryan Parrish

That is the complex-project meeting.

A complex-project meeting can be helpful for any project. The law identifies projects over 1,000 feet as complex projects.

15:17 | Christopher Martin

Are there other requirements people should know about?

15:29 | Ryan Parrish

Anytime there is a drawing associated with One Call, there must be a design notification.

If the project is more than 90 days away, a preliminary design can get the process started.

Facility owners can provide available plans. Excavators should want to know what they will be working around.

Sometimes the records from facility owners are old or inaccurate. It is better to discover that early.

16:17 | Ryan Parrish

The preliminary design gets the process started.

As the project gets closer, a final design can identify which utilities are present where excavation is planned.

The records are sent to the designer, who can compare the paper information with the conditions at the jobsite.

If everything looks correct, the design can proceed to the excavator.

If something looks wrong, the designer may need to return to the project owner and request additional funding to determine where the utilities are before passing the project to the excavator.

The goal is to avoid giving an excavator information that could lead to utility damage.

17:09 | Jon O’Brien

We promote Pennsylvania One Call training days to our members, but occasionally someone tells us they did not know the free training existed.

Are there other services or educational opportunities that people may not know about?

17:43 | Ryan Parrish

There are 12 liaisons across the state, and we are required to hold educational programs.

We offer locator programs, including programs that provide DEP credits. We hold programs in the fall and spring.

We also offer excavator programs and designer training in the fall and spring.

No matter where someone is in Pennsylvania, a liaison can provide those programs.

18:26 | Ryan Parrish

We also offer online webinars about excavation safety, design safety, and other subjects.

18:37 | Jon O’Brien

If a contractor or excavator has a specific issue, can you develop training for them or work with them directly?

18:52 | Ryan Parrish

If an organization needs help, we will visit the office and provide training.

For the past several weeks, I’ve been helping the same township enter complex-project tickets and learn how to use Coordinate PA.

The liaisons will come to you. We can meet in an office, on the side of the road, or work from a laptop on the bed of a truck.

We will come to you to provide training.

19:30 | Christopher Martin

Are there other issues you and your colleagues encounter that make you wonder why people continue doing something incorrectly?

How else can we help communicate the message, especially when it comes to hazards that people cannot see?

19:58 | Ryan Parrish

Generally, people need to call.

I feel like people are afraid to call.

Homeowners can use the service at no cost. There is no excuse for a homeowner not to call 811 when installing a mailbox or using powered equipment for a garden. They are still required to call.

20:24 | Ryan Parrish

People also fail to re-notify when something is wrong.

They see a problem, rush through the project, and damage utilities.

Excavators should re-notify as soon as they arrive at the jobsite and notice something is wrong.

Just because someone may be permitted to dig does not necessarily mean digging is the safest choice when markings are missing.

Excavators should use prudent techniques and expose utilities to verify where they are before digging near them.

Utility locations are not always 100% accurate. Excavators must expose and verify the locations before digging into the ground and potentially striking a gas line or another utility.

21:19 | Jon O’Brien

When you call, they will answer regardless of the day of the week.

Several years ago, I was installing French drains at my house. I rented a trencher but had not called 811.

Brenda Riggs called me that weekend while we were discussing legislation. I mentioned the French drains, and she asked whether I had called 811.

I realized I probably should since I tell everyone else to do it.

I called, and someone arrived shortly afterward to mark the lines. They confirmed that I was safe to proceed.

You guys are awesome.

22:22 | Christopher Martin

What I’m hearing is that this may be one of Pennsylvania’s best-kept secrets. We need to promote it so people understand what is available.

I did not realize that, as a homeowner, I needed to call.

Getting this information to the general population and the industry will be important.

23:04 | Christopher Martin

Ryan, thank you so much for joining us today.

This has been a good conversation. I learned several things, which is always good.

Again, Ryan Parrish with Pennsylvania One Call, thank you for joining us. I’m sure we’ll be talking again.

23:20 | Ryan Parrish

I appreciate it. Thank you for having me.

23:23 | Jon O’Brien

Keep up the great work.

23:24 | Ryan Parrish

Thanks.


Transcript Disclaimer

This episode was recorded in December 2024. References to fees, deadlines, project thresholds, training dates, Pennsylvania One Call procedures, and legal or regulatory requirements reflect the conversation at that time.

Readers should consult Pennsylvania 811 and other appropriate official sources for current requirements before beginning excavation or making compliance decisions.

Tagged as: , , , , .

Rate it
Previous post